Client : PT PETROTECH PENTA NUSA
Period : 2023
Scope of Work:
Petrotech Penta Nusa (COMPANY) is undertaking an initiative to establish a new gas processing facility with capacity of 30 MMscfd raw gas. The proposed gas processing facilities are intended to be situated within an existing gas processing facility currently under the operation of PHE Jambi Merang. It is envisaged that the management of the new train will be conducted through a rental mechanism, spanning a contractual period of 9 (nine) years.
The rental gas processing facilities will consist of:
- Production Cooler
- Production Separator
- Booster Compressor System
- Dehydration Unit and Dew Point Control Unit (DPCU)
- Membrane CO2 Removal System
- Condensate Stabilizer Unit (CSU) System
- Utilities (Power Generation, Air Compressor, Fire Fighting, Flare System, Fuel Gas System, Heating System)
- Metering system for raw gas, sales gas and condensate.
Related Projects

Front End Engineering Design (FEED) | Tapus, North Sumatra
Jasa FEED (Front-End Engineering Design) untuk WTIP (Produced Water Treatment Injection Plant) di Tapus

Front End Engineering Design (FEED) | Jambi
FEED of HARI 1, 2, 3 Flowline and HARI 1 Pipeline Services

Front End Engineering Design (FEED) | West Papua
FEED for Asap, Kido, and Merah Field

Front End Engineering Design (FEED) | Sengkang South Sulawesi
Feed Gas Compressor Kampung Baru

Front End Engineering Design (FEED) | Jabung in Jambi, Sumatra
FEED for Marmo Field

Front End Engineering Design (FEED) | Lubuk Linggau, South Sumatra