Client : PT PETROTECH PENTA NUSA
Period : 2023
Scope of Work:
Petrotech Penta Nusa (COMPANY) is undertaking an initiative to establish a new gas processing facility with capacity of 30 MMscfd raw gas. The proposed gas processing facilities are intended to be situated within an existing gas processing facility currently under the operation of PHE Jambi Merang. It is envisaged that the management of the new train will be conducted through a rental mechanism, spanning a contractual period of 9 (nine) years.
The rental gas processing facilities will consist of:
- Production Cooler
- Production Separator
- Booster Compressor System
- Dehydration Unit and Dew Point Control Unit (DPCU)
- Membrane CO2 Removal System
- Condensate Stabilizer Unit (CSU) System
- Utilities (Power Generation, Air Compressor, Fire Fighting, Flare System, Fuel Gas System, Heating System)
- Metering system for raw gas, sales gas and condensate.