Conceptual Design for Walanga, Sampi Sampi, Bonge (WASAMBO) Fields

Conceptual & Preliminary Engineering Design

Conceptual Design for Walanga, Sampi Sampi, Bonge (WASAMBO) Fields

Client : Energy Equity Epic (Sengkang) Pty. Ltd.
Year : 2014
Status : Finished

Scope of Work :
Conceptual design for WASAMBO Central Processing Plant (CPP) and Kiera Metering Station with 80MMscfd capacity, where the work carried out and main equipment used are as follows:

  1. Wellhead and Flowline
  2. Separator and Filter
  3. Gas Compressor
  4. CO2 Removal Package
  5. Gas Dehydration Package
  6. Metering System
  7. Flare System
  8. Condensate Handling
  9. Produced Water Handling
  10. Utilities (Instrument Air System, Fuel Gas System, and Generator)