Client : Energy Equity Epic (Sengkang) Pty. Ltd.
Year : 2014
Status : Finished
Scope of Work :
Conceptual design for WASAMBO Central Processing Plant (CPP) and Kiera Metering Station with 80MMscfd capacity, where the work carried out and main equipment used are as follows:
- Wellhead and Flowline
- Separator and Filter
- Gas Compressor
- CO2 Removal Package
- Gas Dehydration Package
- Metering System
- Flare System
- Condensate Handling
- Produced Water Handling
- Utilities (Instrument Air System, Fuel Gas System, and Generator)