Feed Gas Compressor Kampung Baru

Front End Engineering Design (FEED)

Feed Gas Compressor Kampung Baru

Client : Energy Equity Epic Sengkang
Year : 2016
Status : Finished

Scope of Work :
Front End Engineering Design (FEED) of Gas Compressor Package Installation at Central Processing Plant (CPP) in Kampung Baru Field to maintain pressure 410 psig in delivery point of gas sales since depletion pressure of well occur. 3 unit Gas Compressor Package will be installed for 2 train 2 unit running and 1 unit standby. Gas Compressor Package type is single stage reciprocating compressor with capacity 30 MMscfd (each). The engineering design includes process, process safety, mechanical, piping, instrument, electrical, civil / structure and project management (cost estimate , bid document for EPCI).