Client : Energy Equity Epic Sengkang
Year : 2016
Status : Finished
Scope of Work :
Front End Engineering Design (FEED) of Gas Compressor Package Installation at Central Processing Plant (CPP) in Kampung Baru Field to maintain pressure 410 psig in delivery point of gas sales since depletion pressure of well occur. 3 unit Gas Compressor Package will be installed for 2 train 2 unit running and 1 unit standby. Gas Compressor Package type is single stage reciprocating compressor with capacity 30 MMscfd (each). The engineering design includes process, process safety, mechanical, piping, instrument, electrical, civil / structure and project management (cost estimate , bid document for EPCI).
Related Projects
Front End Engineering Design (FEED) | Jambi
NEW SUNGAI KENAWANG FACILITIES CAPACITY OF 30 MMSCFD PROJECT
Front End Engineering Design (FEED) | Tapus, North Sumatra
Jasa FEED (Front-End Engineering Design) untuk WTIP (Produced Water Treatment Injection Plant) di Tapus
Front End Engineering Design (FEED) | Jambi
FEED of HARI 1, 2, 3 Flowline and HARI 1 Pipeline Services
Front End Engineering Design (FEED) | West Papua
FEED for Asap, Kido, and Merah Field
Front End Engineering Design (FEED) | Jabung in Jambi, Sumatra
FEED for Marmo Field
Front End Engineering Design (FEED) | Lubuk Linggau, South Sumatra
