Client: BP Berau Ltd. - Bina Sarana Putra (BSP)
Scope of Work:
- Construct flowline to connect each Xmas tree wing valve to existing VRA production manifold with single flowline
configuration for each well (no comingle). - Complete each flowline with its accessories such as wet gas flow meters, choke valve, non intrusive sand detector, sampling point, and through conduit double expanding gate valve (10” bel valve).
- Connect the wells to VRA WHCP system.
Related Projects
Detailed Engineering Design (DED) | Salawati Field, Papua
ENGINEERING DESAIN LOKASI SUMUR & JALUR FLOWLINE DI STRUKTUR C, D, E & F SALAWATI FIELD PAPUA
Detailed Engineering Design (DED) | Vorwata Field, Berau Bay, West papua
Engineering for Flare TIP replacement interconecting pipe instalation project
Detailed Engineering Design (DED) | Vorwata Field, Berau Bay, West Papua
Detailed Engineering of offshore flowline infill & workover wellss project at Tangguh LNG Facilities
Detailed Engineering Design (DED) | JABUNG JAMBI, SUMATRA SELATAN
SW-WB Permanent Facilities CPS Modification
Detailed Engineering Design (DED) | BALIKPAPAN, EAST KALIMANTAN
Planning and Evaluation of surface facilities base on derivelable at Pertamin EP asset 5 for 18 Months
Detailed Engineering Design (DED) | Berhala Strait Offshore in Jambi