Offshore Flowline Infill Wells Project at Tangguh LNG Facilities

Detailed Engineering Design (DED)

Offshore Flowline Infill Wells Project at Tangguh LNG Facilities

Client: BP Berau Ltd. - Bina Sarana Putra (BSP)

Scope of Work:

  • Construct flowline to connect each Xmas tree wing valve to existing VRA production manifold with single flowline
    configuration for each well (no comingle).
  • Complete each flowline with its accessories such as wet gas flow meters, choke valve, non intrusive sand detector, sampling point, and through conduit double expanding gate valve (10” bel valve).
  • Connect the wells to VRA WHCP system.

Go Back