Client : Petronas Carigali Muriah Ltd.
Year : 2014-2015
Status : Finished
Scope of Work :
We did various engineering studies for Bukit Tua Field and Kepodang Field, specifically:
- Condensate recovery from wellhead platform (WHP) to floating production storage and offloading (FPSO) and from FPSO to the onshore receiving facility (ORF)
- Wax management study at pipelines and wellhead tubing
- Sand erosion study
- Flaring study at the FPSO
Related Projects

Engineering Studies | Balikpapan, East Kalimantan
Engineering Studies di PT Pertamina EP Asset 5

Engineering Studies | Jabung in Jambi, Sumatra
Assessment of Mooring and Berthing System on Oil Terminal

Engineering Studies | Multiple areas in Bunyu Field in Bulungan, North Kalimantan
Engineering Studies for Pertamina EP Asset 5’s Surface Production Facilities

Engineering Studies | Jabung in Jambi, Sumatra
Technical & Risk Assessment for TAC Pertamina EP - BWP Meruap

Engineering Studies | Multiple areas in Sumatra