Client : Petronas Carigali Muriah Ltd.
Year : 2014-2015
Status : Finished
Scope of Work :
We did various engineering studies for Bukit Tua Field and Kepodang Field, specifically:
- Condensate recovery from wellhead platform (WHP) to floating production storage and offloading (FPSO) and from FPSO to the onshore receiving facility (ORF)
- Wax management study at pipelines and wellhead tubing
- Sand erosion study
- Flaring study at the FPSO