Client : PC KETAPANG II LTD -PETRONAS
Period : 2014
Scope of Work:
Conceptual Design of Condensate Handling Study at Bukit Tua Field. It include verification of previous study result with regards to quantity of formed condensate in the pipeline, slugging calculation with several cases/scenarios and determine the pigging frequency; obtain conceptual facility design for condensate handling at ORF (Onshore Receiving Facilities) covering the main equipment and its sizing, control system, mechanical specification Bill of Material, cost estimation, and HSE matters and obtain feasibility analysis of installation condensate handling facility against the condensate produced.
Conceptual Design of Scalling and Corrosion Study at Bukit Tua Field. It include obtain engineering review for severity of corrosion and scalling problem and obtain conceptual mitigation plan and practicable recommedation for corrosion and scalling problem at Bukit Tua Facility.