EPCI for New Condensate at North Geragai Facilities

Engineering, Procurement, Construction, and Installation (EPCI)

EPCI for New Condensate at North Geragai Facilities

Client : Joint Operating Body Pertamina - Talisman Jambi Merang (JOB PTJM) & PetroChina International Jabung Ltd.
Year : 2014-2015
Status : Finished

Scope of Work :
Detailed engineering for brownfield plant for new condensate storage tank facilities installation with main equipment used in the project are as follows:

  • Two storage tanks with 6,000 bbl and 20,000 bbl capacity
  • Condensate pump
  • Custody meter
  • Vent stack
  • Utilities such as instrument air system and firewater system