Scope of Work :
Detailed engineering for wellhead topside modification at KE-38 plant since there was a pressure depletion at the wellhead. The work we carried out are as follows:
- Temporary production facility (TPF) set up near the WHP.
- The new WHP will be a semi-manned facility previously the WHP is an unmanned facility.
- Modification of control and monitoring system, where the new system will be integrated with the TPF.
- Installation of fire protection system and fire & gas detection system
- Installation of gas lift system