EPCI for PHE KE-38 W ellhead Platform (WHP) Modification

Engineering, Procurement, Construction, and Installation (EPCI)

EPCI for PHE KE-38 W ellhead Platform (WHP) Modification

Client : Pertamina Hulu Energi West Madura Offshore (PHE WMO)
Year : 2013
Status : Finished

Scope of Work :
Detailed engineering for wellhead topside modification at KE-38 plant since there was a pressure depletion at the wellhead. The work we carried out are as follows:

  • Temporary production facility (TPF) set up near the WHP.
  • The new WHP will be a semi-manned facility previously the WHP is an unmanned facility.
  • Modification of control and monitoring system, where the new system will be integrated with the TPF.
  • Installation of fire protection system and fire & gas detection system
  • Installation of gas lift system