Client : ENERGY EQUITY EPIC (SENGKANG)
Year : 2012
Status : Finished
Scope of Work :
Detailed Engineering for Kampung Baru Upgrading Facilities and Patila metering Station with built train#2 with capacity of 35 MMscfd located at Sengkang. It consists of Wellhead flowline, Separator, CO2 Removal Package, Gas Dehydration Package, Metering System, Condensate handling, Produced Water Handling, Flaring System, and Utilities (Instrument Air System, Fuel Gas System, Generator).