Engineering detail desain for EPCI Kampung baru gas plant upgrading project

Detailed Engineering Design (DED)

Engineering detail desain for EPCI Kampung baru gas plant upgrading project

Client : ENERGY EQUITY EPIC (SENGKANG)
Year : 2012
Status : Finished

Scope of Work :

Detailed Engineering for Kampung Baru Upgrading Facilities and Patila metering Station with built train#2 with capacity of 35 MMscfd located at Sengkang. It consists of Wellhead flowline, Separator, CO2 Removal Package, Gas Dehydration Package, Metering System, Condensate handling, Produced Water Handling, Flaring System, and Utilities (Instrument Air System, Fuel Gas System, Generator).