Detailed Engineering of offshore flowline infill & workover wellss project at Tangguh LNG Facilities

Detailed Engineering Design (DED)

Detailed Engineering of offshore flowline infill & workover wellss project at Tangguh LNG Facilities

Client : BP BERAU LTD under PT BSP

Period : 2022

Scope of Work:

Providing Detailed Engineering Design (DED) for company with following scope of work:

  • Construct flowline to connect each Xmas tree wing valve to existing VRB production manifold with single flowline configuration for each well (no comingle).
  • Complete each flowline with its accessories such as wet gas flow meters, choke valve, non-intrusive sand detector, sampling point, and through conduit double expanding gate

Connect the wells to VRB WHCP system.