Client : Pertamina EP Asset 5
Year : 2013-2014
Status : Finished

Scope of Work :
We did the technical assessment for Bunyu Field’s surface production facilities that consist of 5 oil plants and 2 gas plants, specifically:

  • Evaluation of existing equipment based on their current condition
  • Optimization of existing equipment to be in accordance with the future developments of the production capacity and the plant assessments