Client : Pertamina EP Asset 5
Year : 2013-2014
Status : Finished
Scope of Work :
We did the technical assessment for Bunyu Field’s surface production facilities that consist of 5 oil plants and 2 gas plants, specifically:
- Evaluation of existing equipment based on their current condition
- Optimization of existing equipment to be in accordance with the future developments of the production capacity and the plant assessments