Client : Energy Equity Epic (Sengkang) Pty. Ltd.
Year : 2012
Status : Finished

Scope of Work :
Detailed engineering for a gas plant with a maximum capacity of 35MMscfd. The main equipment used for the projects are as follows:

  • Wellhead and Flowline
  • Separator and Filter
  • Amine Gas Sweetening Package
  • Gas Dehydration Package
  • Gas Custody Meter
  • Condensate Handling
  • Utilities (Instrument Air System, Fuel Gas System, Firewater System, Power System, and Flare System)