Client : PT Energi Mega Persada Tbk. (EMP)
Year : 2012
Status : Finished
Scope of Work :
Front End Engineering Design (FEED) for oil receiving and offloading facility with a capacity of 5,000 BOPD. Our works consist of the storage tank, transfer pump, diesel generator with fuel tank, loading & filling station.