DED for Mooring Dolphin Modification at LPG & Oil Terminal

Detailed Engineering Design (DED)

DED for Mooring Dolphin Modification at LPG & Oil Terminal

Client : PetroChina International Jabung Ltd.
Year : 2017
Status : Finished
Category : Detailed Engineering Design (DED) & Engineering, Procurement, Construction, and Installation (EPCI)

Scope of Work :

  • Assess the current condition of the mooring dolphin.
  • Analyze what can be modified to the mooring dolphin to optimize the structure.
  • DED for mooring dolphin modification including the development of project schedule, cost estimation, and the Engineering, Procurement, Construction, and Installation (EPCI) process.

Go Back

Related Projects

DED for OSBL TDAE Plant

Detailed Engineering Design (DED)   |   Kabil Integrated Industrial Estate (KIIE), Batam

DED for OSBL TDAE Plant

Loading