Client : PetroChina International Jabung Ltd.
Year : 2017
Status : Finished
Category : Detailed Engineering Design (DED) & Engineering, Procurement, Construction, and Installation (EPCI)
Scope of Work :
- Assess the current condition of the mooring dolphin.
- Analyze what can be modified to the mooring dolphin to optimize the structure.
- DED for mooring dolphin modification including the development of project schedule, cost estimation, and the Engineering, Procurement, Construction, and Installation (EPCI) process.
Related Projects

Detailed Engineering Design (DED) | Kabil Integrated Industrial Estate (KIIE), Batam