Client: PetroChina International Jabung Ltd.
Scope of Work:
Conducted a thorough inspection and assessment of the jetty structure and mooring system due to the offtake tanker’s capacity enhancement; the tanker would be operated with ship-to-ship transfer method.
Related Projects
Engineering Studies | East Java
Engineering Studies for Petronas Carigali Muriah
Engineering Studies | Multiple areas in Bunyu Field in Bulungan, North Kalimantan
Engineering Studies for Pertamina EP Asset 5’s Surface Production Facilities
Engineering Studies | Jabung in Jambi, Sumatra
