Client : PETROCHINA INTERNATIONAL JABUNG
Period : 2019
Scope of Work:
Detailed Engineering for EPCI installation fire water system, firefighting system and gas suppression system at area WB PPF and SWB PPF. Each Area Facilities consists of Fire Water Pond, 2 unit Diesel Fire Water Pump, 1 unit Jockey Fire Water Pump, fire water main ring, fire hydrant, foam monitor, fire extinguisher and gas suppression system.
Related Projects
Detailed Engineering Design (DED) | Salawati Field, Papua
ENGINEERING DESAIN LOKASI SUMUR & JALUR FLOWLINE DI STRUKTUR C, D, E & F SALAWATI FIELD PAPUA
Detailed Engineering Design (DED) | Vorwata Field, Berau Bay, West papua
Engineering for Flare TIP replacement interconecting pipe instalation project
Detailed Engineering Design (DED) | Vorwata Field, Berau Bay, West Papua
Detailed Engineering of offshore flowline infill & workover wellss project at Tangguh LNG Facilities
Detailed Engineering Design (DED) | Vorwata Field, Berau Bay, West Papua
Offshore Flowline Infill Wells Project at Tangguh LNG Facilities
Detailed Engineering Design (DED) | BALIKPAPAN, EAST KALIMANTAN
Planning and Evaluation of surface facilities base on derivelable at Pertamin EP asset 5 for 18 Months
Detailed Engineering Design (DED) | Berhala Strait Offshore in Jambi
