Client : ENERGY EQUITY EPIC (SENGKANG)
Year : 2012
Status : Finished
Scope of Work :
Detailed Engineering for Kampung Baru Upgrading Facilities and Patila metering Station with built train#2 with capacity of 35 MMscfd located at Sengkang. It consists of Wellhead flowline, Separator, CO2 Removal Package, Gas Dehydration Package, Metering System, Condensate handling, Produced Water Handling, Flaring System, and Utilities (Instrument Air System, Fuel Gas System, Generator).
Related Projects
Detailed Engineering Design (DED) | Salawati Field, Papua
ENGINEERING DESAIN LOKASI SUMUR & JALUR FLOWLINE DI STRUKTUR C, D, E & F SALAWATI FIELD PAPUA
Detailed Engineering Design (DED) | Vorwata Field, Berau Bay, West papua
Engineering for Flare TIP replacement interconecting pipe instalation project
Detailed Engineering Design (DED) | Vorwata Field, Berau Bay, West Papua
Detailed Engineering of offshore flowline infill & workover wellss project at Tangguh LNG Facilities
Detailed Engineering Design (DED) | Vorwata Field, Berau Bay, West Papua
Offshore Flowline Infill Wells Project at Tangguh LNG Facilities
Detailed Engineering Design (DED) | JABUNG JAMBI, SUMATRA SELATAN
SW-WB Permanent Facilities CPS Modification
Detailed Engineering Design (DED) | BALIKPAPAN, EAST KALIMANTAN