Client: PetroChina International Jabung Ltd.
Scope of Work:
- Assess the current condition of the mooring dolphin.
- Analyze what can be modified to the mooring dolphin to optimize the structure.
- DED for mooring dolphin modification including the development of project schedule, cost estimation, and the Engineering, Procurement, Construction, and Installation (EPCI) process.
Related Projects
Detailed Engineering Design (DED) | Salawati Field, Papua
ENGINEERING DESAIN LOKASI SUMUR & JALUR FLOWLINE DI STRUKTUR C, D, E & F SALAWATI FIELD PAPUA
Detailed Engineering Design (DED) | Vorwata Field, Berau Bay, West papua
Engineering for Flare TIP replacement interconecting pipe instalation project
Detailed Engineering Design (DED) | Vorwata Field, Berau Bay, West Papua
Detailed Engineering of offshore flowline infill & workover wellss project at Tangguh LNG Facilities
Detailed Engineering Design (DED) | Vorwata Field, Berau Bay, West Papua
Offshore Flowline Infill Wells Project at Tangguh LNG Facilities
Detailed Engineering Design (DED) | JABUNG JAMBI, SUMATRA SELATAN
SW-WB Permanent Facilities CPS Modification
Detailed Engineering Design (DED) | BALIKPAPAN, EAST KALIMANTAN